A Fuxing High Speed Comprehensive Inspection Train Conducts Dynamic Testing on the Huhhot-Ulanqab Section of the Beijing-Baotou High Speed Railway
Published:2024-08-30
【字体:大中小】
In response to the high temperatures during the summer, the Huhhot Power Supply Section has intensified inspections of the overhead contact line equipment and analysis of 6C data. They are thoroughly analyzing the data collected by the High Speed comprehensive inspection train to promptly identify potential risks and defects, ensuring a comprehensive understanding of the operational status of the equipment within their jurisdiction. The photo shows a Fuxing High Speed comprehensive inspection train conducting dynamic testing on the Huhhot-Ulanqab section of the Beijing-Baotou High Speed Railway.
附件: